BBMM the team responsible for Area 2 of the
Motorway network, have had an ongoing
problem with repairs to the existing, extruded
asphalt hard shoulder kerb.
The costs of setting up an extruder for what
was relatively minor repairs was prohibitive,
and they were therefore looking for other
options in the form of alternative kerbing
products.
Their wish list, was to find a product that
matched as closely as possible the profile of
the extruded kerb i.e. splay, and could be
installed quickly and efficiently.
The speed and simplicity of the installation
process was of paramount importance, along
with the product availability, due to the inherent
problems and costs associated with Motor
-way lane closures.
As a belt and braces solution additional Scan
adhesive was used in the form of Scan Strip on
a one to one basis with the kerb. Usually used
as a packer the Scan Strip helped provide better
adhesive contact between the kerb base and
prepared substrate, therefore reducing the
preparation time prior to installation. To complete
the work, concrete was poured between
the kerb and the safety barrier.
Scan Kerb is a reinforced concrete stick down
kerb which has Highways Agency approval under
(section 1101 paragraph 2 of Highway
works). Manufactured to BS EN 1340.
The standard A1 kerb (splay profile) is delivered
to site with the adhesive pre bonded to the underside
of the kerb, the only preparation is to
sweep the highway to remove dust and debris,
prime the pre-marked kerb line with Scan coat,
and bed the kerb in place, in cold weather it
may be advisable to heat the road surface and
underside of kerb to help speed up the adhesion
process.
Area 2 have been using Scan Kerb since Dec 10
they have installed over a 1000 kerbs, 800
strips with over 100 litres of Scan Coat.
The key factors effecting the choice of Scan
Kerb on this project, was the short term lane
closures, and the speed of installation. The
lack of excavation and plant requirement, and
Scan Kerb availability, enabled the contractor
to complete this project on time and to the
satisfaction of the client and client’s agent.
Project completed March 2011.
Points of Interest
Product: Scan Kerb Type A
Quantities:
Scan Kerb Type A1 - 96No
Scan Coat 5Litre - 1No
Scan Strip - 80No
Project Team
Area 2
Balfour Beatty
Mott Macdonald
Burdens Key Accounts